EV charger installation in Miami-Dade and South Florida
A Level 2 charger at home charges most electric cars overnight. We check that your panel can handle it, run a dedicated circuit, install the charger you choose (or help you pick one), and get it permitted and inspected.
What we handle
- Load check of your panel and service
- Dedicated circuit sized for the charger
- Wall-mounted or hardwired Level 2 chargers, any major brand
- Outdoor-rated installs for carports and driveways
- Panel upgrade if the house needs more capacity
- Permit and inspection
- Commercial and multi-car charging
Will my panel handle a charger?
Many homes can add a charger without a panel upgrade, especially with a charger set to a lower amperage. If yours can't, we'll tell you the options, including a panel or service upgrade.
Bring the charger's model or a link and we'll confirm what circuit it needs.
Common questions
Do I need a permit to install an EV charger?
Yes. A new circuit for an EV charger needs an electrical permit in Florida. We pull it and handle the inspection.
How long does an EV charger install take?
A typical home install with a nearby panel is done in a few hours. Longer runs or a panel upgrade take more time.
Service areas
Serving homes and businesses from the Florida Keys to Fort Myers.
Related services
- A/C repair
- A/C installation & replacement
- Mini split installation
- A/C maintenance
- Electrical contractor
- Electrical panel upgrades
- A/C & electrical permits
Get a free quote
Mon–Fri 7am–5pm · (305) 842-0295